Quantitative Aptitude Test 118

Test # 118


1.
A certain number of men can finish a piece of work in 100 days. If however, there were 10 men less, it would take 10 days more for the work to be finished. How many men were there originally ?

Login/Register to access massive collection of FREE questions and answers.
Login/Register

Quantitative Aptitude
Quiz Index
1300 questions in 130 tests. Each test contains 10 questions.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130

Idiom of the Day

John Hancock
one's signature
I wrote down my John Hancock and bought the car.

Word of the Day

My Account / Test History


Fast and Furious Cars in the world

Skyline Powered 1967 Ford Mustang

The RB engine powered 1967 Mustang fastback is probably one of the most controversial cars in the Fast and Furious franchise due to its hybrid customization using Japanese parts. Nevertheless, it is still a car worthy to be noted on this list because of its specs. This Mustang boasts of the famed RB26DETT engine which was pulled from a 2001 R34 Skyline. This engine is a twin turbocharged inline six that arguably puts out 320 330 horsepower (even though it claims to only put out about 220 horsepower). The supped up mustang also boasts of a overhauled suspension system that enables the car to sustain the abuse of drifting.

English Grammar
Home
My Account
English Test
Verbal Reasoning
GK Quiz
Grammar Test